Plant Facilities and Resources

Location:

Annacis Island Industrial Park
441 Derwent Place,
Delta, BC V3M 5Y9

The heart of Vancouver’s industrial area

Property and Buildings:

5.4 acres with Foreshore lease

Main Fabrication bay:28000 sq ft (segregation provided between carbon and stainless steel)
2nd Fabrication bay:8000 sq ft (dedicated for stainless and alloy fabrication)
Machine shop and assembly bay:12000 sq ft
Painting bay:4000 sq ft
Yard and Storage:6000 sq ft

Capabilities

Testing procedures

Hydrostatic Test
Pneumatic Test
Radiography Inspection
Magnetic Particle Inspection
Liquid Dye Penetrant
Black light Dye Penetrant
Ultrasonic Inspection
Helium Leak Test
Brinnell Hardness Test
Positive Material Identification

Finishing process

Sandblasting and Glass beading
Stainless steel passivation
Painting:
   Epoxy Coating
   Plasite application